So now that we have a deadline (only 154 days to go!), we have once again turned our full attention to completing the few outstanding projects around the house. Over the past couple months we have already managed to check a few items off the list but of course we have also managed to add a few items to the list.
"To
Do"
Install trim around vent pipe in bathroom
Paint interior doors
Install door hardware, everywhere
Install powder room window and hardware
Touch up stair railing
Build spare bedroom desk
Paint front entrance
Complete front entrance cabinet
Get front door and dining room windows repaired
Paint main floor walls and trim
Paint windows
Touch-up paint, everywhere
Fix downspout
Complete irrigation system
Build bike shed
Complete electrical inspection again
Fill nail holes in hardwood floors
Complete concrete edges on front steps
Replace all the plugs with tamper proof plugs
Install hooks in the main entrance
Install blinds in spare bedroom
Install dining room light fixture
Complete shingles on roof
Fix shower curtain rod in bathroom
Build compost bins
Seal wood deck
Seal concrete deck and sidewalks