Checking Off the List

"To Do"

  • Install bathroom door
  • Install trim around vent pipe in bathroom
  • Paint interior doors
  • Paint inner front door
  • Install closet doors, everywhere
  • Install door hardware, everywhere
  • Install powder room window and hardware
  • Install stair railing
  • Complete drywall in linen closet
  • Install linen closet shelves - almost done!
  • Install office shelves - started!
  • Build office desk - done any day now!
  • Build spare bedroom desk
  • Paint front entrance
  • Complete front entrance bench
  • Get front door and dining room windows repaired
  • Install crown moulding on main floor
  • Install baseboard on main floor
  • Paint main floor walls and trim - only touch up around the fireplace left!
  • Complete fireplace mantel - almost done!
  • Install gas insert in fireplace
  • Paint windows
  • Touch-up paint, everywhere
  • Remove and replace siding, on the entire house
  • Replace eavestroughs
  • Rebuild front steps
  • Complete furnace inspection
  • Complete electrical inspection again
  • Fill nail holes in hardwood floors
  • Complete trim on exterior of house
  • Complete brick on front steps
  • Complete concrete edges on front steps
  • Install mail box
  • Install Juliette balcony railing
  • Replace all the plugs with tamper proof plugs
  • Install return air vents
  • Install hooks in the main entrance
  • Install bathroom fixtures in powder room
  • Install blinds in spare bedroom
  • Install dining room light fixture
  • Complete shingles on roof

The list is getting longer not shorter... argh!

Amy