"To Do"
Install bathroom door- Install trim around vent pipe in bathroom
- Paint interior doors
Paint inner front door- Install closet doors, everywhere
- Install door hardware, everywhere
- Install powder room window and hardware
- Install stair railing
Complete drywall in linen closet- Install linen closet shelves - almost done!
- Install office shelves - started!
- Build office desk - done any day now!
- Build spare bedroom desk
- Paint front entrance
- Complete front entrance bench
- Get front door and
dining room windowsrepaired - Install crown moulding on main floor
Install baseboard on main floor- Paint main floor walls and trim - only touch up around the fireplace left!
- Complete fireplace mantel - almost done!
Install gas insert in fireplace- Paint windows
- Touch-up paint, everywhere
Remove and replace siding, on the entire houseReplace eavestroughsRebuild front stepsComplete furnace inspection- Complete electrical inspection again
- Fill nail holes in hardwood floors
- Complete trim on exterior of house
- Complete brick on front steps
- Complete concrete edges on front steps
- Install mail box
- Install Juliette balcony railing
- Replace all the plugs with tamper proof plugs
- Install return air vents
- Install hooks in the main entrance
- Install bathroom fixtures in powder room
- Install blinds in spare bedroom
- Install dining room light fixture
- Complete shingles on roof
The list is getting longer not shorter... argh!