Monday, August 15, 2011

State of the Renovation

We are now officially at Day 302 of the renovation.

Yup. 302 days.

Just to make sure we are good and depressed, I decided to compile a list of what we have left to complete.


"To Do"

  • Install bathroom door
  • Install trim around vent pipe in bathroom
  • Paint interior doors
  • Paint inner front door
  • Install closet doors, everywhere
  • Install door hardware, everywhere
  • Install powder room window and hardware
  • Install stair railing
  • Complete drywall in linen closet
  • Install linen closet shelves
  • Install office shelves
  • Build office desk
  • Build spare bedroom desk
  • Paint front entrance
  • Complete front entrance bench
  • Get front door and dining room windows repaired
  • Install crown moulding on main floor
  • Install baseboard on main floor
  • Paint main floor walls and trim
  • Complete fireplace mantel
  • Install gas insert in fireplace
  • Paint windows
  • Touch-up paint, everywhere
  • Remove and replace siding, on the entire house
  • Replace eavestroughs
  • Rebuild front steps
  • Complete furnace inspection
  • Complete electrical inspection